Builders and Remodelers
To arrange for a new or relocated gas meter, call 715-425-6177
and ask to speak to Greg Lee.
These documents may be helpful to you:
Application for installation of a new natural gas service line
Gas meter location requirements
Gas meter location options: front, banked, alcoves
Some of the files on this page are in PDF format Acrobat Reader can be downloaded for free here. |
For safety reasons, we recommend meters not be enclosed.
In case of a fire, emergency response personnel need quick access
to the
safety shutoff valve of the gas meter. However, if enclosure is
necessary for aesthetic reasons, submit a design to us for
approval. You may fax it to 715-425-1075, Attention: Greg Lee.
Our normal construction season is April 1 – Thanksgiving, depending on whether the ground is frozen or thawed. We can thaw ground at an additional cost.
We charge extra to install in rock.
To arrange for installation of gas main along a right-of-way or
throughout a new housing development, call and ask to speak to
Greg Lee. An Aid-to-Construction pre-payment will be required.
|